Knockdown rebuild in Perth, matched to the right builder
If your block is in the perfect spot but your house has reached the end of its life, a knockdown rebuild can offer a fresh, modern home without having to sacrifice the suburb you love.

Do I renovate, or just start fresh?
House & Land Co are Perth’s knockdown rebuild specialists and help to streamline every step, from home demolition in Perth to handing over your new keys.
If you already own land (or are inheriting family land), many Perth homes built decades ago no longer meet modern standards for layout, energy efficiency or liveability. Rather than renovating around old problems, knocking down and rebuilding from scratch gives you a clean start, a contemporary design and a significant increase to asset value, all without leaving your postcode.

The demolish & build advantage
Stay in your ideal location
A knock down and rebuild lets you remain close to schools, transport, family and lifestyle essentials. You keep everything you love about your suburb while completely upgrading your home.
Modern design on your terms
Choose a layout that suits your current lifestyle, not one from decades ago. Our builder network offers flexible homes with smart layouts, natural light, modern features and future-proof design options.
Avoid hidden costs and patchwork headaches
Renovations can uncover structural issues, electrical problems or water damage that balloon your budget. A tear down and rebuild replaces constantly changing costs with a predictable, fixed-price solution.
Increase your land value with a modern home
Replacing an ageing property with a new build immediately improves street appeal and boosts long-term value. A modern home makes far better use of a Perth block and strengthens your future resale potential.
Fast, fixed-price builds through our builder network
We compare Perth’s leading rebuild specialists for you, securing competitive pricing, clear timelines and strong warranties, so the process is smooth and managed by professionals who do this every day.
Suits investors, retirees, upgraders & subdividers
Whether you’re an investor wanting a low-maintenance rental, a family needing more space, or a homeowner exploring subdivision, these packages can be tailored to suit any goal.
Our proven knockdown rebuild process
Council approval, demolition & site preparation
We handle the tricky parts: lodging the correct paperwork, obtaining demolition quotes, organising any necessary site works, and giving you a clear estimate of what it will cost to knock down your house.
Design, compare & customise
Once the site is set, we explore design options and builders that suit your budget and vision. You pick a floorplan, we show you comparable builds and specs, then help personalise what matters most: layouts, storage, finishes and fittings.
Sign, build & get the keys
After approvals and contracts, construction begins at a fixed price you can trust. We keep you updated, handle any issues that crop up and make sure the build stays on track, right through to handover.
FREE GUIDE
The step-by-step guide to a knockdown rebuild
Nine pages, in plain English. What a knockdown rebuild actually involves, what to check on your own block before you spend anything, and the costs that catch people out.
- What a knock down rebuild is, and when it makes sense
- A self-check: is your block a good candidate?
- The 17 steps, from first conversation to construction start
- The costs that are easy to miss
- Four contract words worth knowing before you sign

What would the repayments look like?
You already own the block, so there is no land to buy. This models the repayments on the build itself.
Repayment Calculator
These figures use the same APRA-aligned 9% serviceability assessment your lender will apply. Indicative only — speak with a House & Land Co specialist for personalised advice.
Your repayment estimate
Fill in the form and click Calculate to see what your loan would cost each week, fortnight or month.
Per month
$0
at 0.00% p.a. — based on the inputs you entered.
your report is on its way
It's landing in your inbox right now. Meanwhile, here's the full breakdown:
Here's the full picture.
Calculated specifically for you. We've also sent a copy to your inbox.
The numbers
Total interest
$0
Total cost of this loan
$0
Loan amount + total interest paid over the term
Principal vs interest over time
| Year | Principal | Interest | Total |
|---|
Before you rely on a number
An estimate based on what you enter, not a loan approval or financial advice. Your lender will assess your situation on its own criteria.
What a knockdown rebuild costs, beyond the build price
A knockdown rebuild is two projects sharing a block. One is a demolition, run by your council and three utilities. The other is a build. Budgets go wrong when the first is treated as a line item in the second.
The fees that are fixed before anyone quotes
Before a demolition contractor prices anything, the demolition permit, the Building Services Levy and the water, power and gas disconnections come to about $3,340 on a house with gas connected, plus a refundable verge bond set by your council. The building permit for the new home is on top of that: on a $450,000 certified build, the permit fee and levy add roughly another $1,470. We list every fee, who charges it and where it is published in what it costs to demolish a house in Perth.
Rent and loan interest
You cannot live in the house while it is being built. Plan on twelve to eighteen months of rent somewhere else while you pay interest on the drawn part of your construction loan. Neither is on a builder’s quote, because neither is the builder’s to charge. For most households it is the second-largest number in the project, so put it at the top of the budget, not the bottom.
What the build price leaves out
An advertised home design price is the house, not the project. Site works priced from your soil classification, retaining where the block falls, stormwater and the driveway crossover all sit outside it. Ask for quotes with separate lines for demolition, asbestos survey, licensed removal, disconnections, tipping, site works and the crossover, and ask which are fixed prices and which are provisional sums. Two quotes that include different things are not two quotes.
Why the totals you read online disagree
Two of the most-read Perth pages on this both say twelve to eighteen months. One means demolition through to handover. The other means slab down, leaving out planning and demolition. Before you compare any figure, find out where it starts and stops counting.
How long it takes, and the approvals that set the pace
Plan for around eighteen months from first quote to handover. The stages that slip are almost never the construction. They are the approvals and disconnections at the front, where most people start too late.
The demolition permit
Section 10 of the Building Act 2011 makes it an offence to demolish without a permit. You apply on form BA5 to your local government. Regulation 20 of the Building Regulations 2012 gives the council 10 business days to decide, or longer only if you agree in writing. If it misses that deadline, the application is taken to be refused and the fee is refundable as a debt owed to you.
The building permit
The permit for the new home is a separate application with its own clock:
| Application | Decision period | Fee |
|---|---|---|
| Certified, form BA1 | 10 business days | 0.19% of the value of the work, minimum $121.00 |
| Uncertified, form BA2 (Class 1a and Class 10 only) | 25 business days | 0.32% of the value of the work, minimum $121.00 |
A certified application arrives with a certificate of design compliance from an independent building surveyor, which is why it is decided faster. Most volume builders lodge certified as a matter of course. Source: Building and Energy.
Planning approval, when it also applies
A single house that meets the deemed-to-comply provisions of the Residential Design Codes can often go ahead on a building permit alone. Planning approval is more likely if your block is in a heritage or character area, if the design varies the setbacks or open space requirements, or if you are subdividing. This is the step that adds months rather than weeks. The R-Codes are no longer State Planning Policy 7.3: since April 2024 they are a Planning Code under the Planning and Development Act 2005, currently Residential Design Codes Volume 1, Version 3.
The realistic timeline
| Stage | How long |
|---|---|
| Design, quotes, finance and contract | 2 to 4 months |
| Gas disconnection | Up to 20 business days after processing, so lodge it first |
| Electricity abolishment | Allow 5 business days, plus the Disconnected for Demolition Notice |
| Water disconnection | No published lead time, so start early |
| Demolition permit | 10 business days statutory, plus the council's queue |
| Asbestos removal and demolition | The demolition takes days; the process around it takes weeks |
| Building permit | 10 business days certified, 25 uncertified |
| Construction | Set by your building contract. Get the construction period in writing before you sign |
What your block does to the price
Two blocks in the same street can price thousands apart for the same house. The difference is under the ground and around the edges.
Site classification
Before the slab is designed, an engineer classifies the soil under Australian Standard AS 2870. The class drives the footing design, and the footing design drives the site works cost.
| Class | What it means |
|---|---|
| A | Most sand and rock sites, little or no ground movement from moisture changes |
| S | Slightly reactive clay, slight ground movement |
| M | Moderately reactive clay or silt, moderate ground movement |
| H1 | Highly reactive clay, high ground movement |
| H2 | Highly reactive clay, very high ground movement |
| E | Extremely reactive, extreme ground movement |
| P | Problem sites: soft or loose soils, landslip, mine subsidence, collapsing soils, erosion, abnormal moisture, or sites that cannot otherwise be classified |
Filled sites are classified A to P depending on what is under them. Your neighbour’s classification tells you very little, particularly in older suburbs where fill went in unevenly. Insist the soil test is done on your land, after demolition where possible, and that the site works figure is priced from it. Definitions from AS 2870 as reproduced in the National Construction Code.
Slope, access and what is under the slab
Fall across the block drives cut, fill and retaining. A narrow verge, a tight driveway or a power line across the frontage decides whether the crew can use standard machinery. What sits under the old slab, such as a septic system, a filled-in pool or rubble fill, is only found once the house is gone, which is why site works is so often a provisional sum.
Asbestos
If your home was built before 1990, assume there is asbestos until a survey says otherwise. On a knockdown rebuild its removal is licensed work, and it is the owner’s cost. Get the survey done before you sign anything with a demolition allowance in it. We set out the licence classes and what the law requires in our demolition cost guide.
Your contract protections, and their limits
The Home Building Contracts Act 1991 covers fixed-price residential building contracts between $7,500 and $500,000. Inside that band, a builder can take a deposit of no more than 6.5% of the contract price, and must hold home indemnity insurance and give you the certificate before starting work or asking for any payment on work valued over $20,000.
Two limits matter on a knockdown rebuild. Above $500,000 the Act does not apply and there is no deposit cap, and plenty of Perth rebuilds now go over that figure. And demolition sits outside the Act altogether, so a stand-alone demolition contract has no deposit cap and no home indemnity insurance. Ask who holds the demolition contract and on what terms before you sign either one.
The WA Government is reviewing these thresholds in 2026, so check the current figures with Building and Energy before you sign.
Is a knockdown rebuild right for you?
A rebuild is ideal if your current home needs major upgrades, your block itself is especially valuable, or renovation costs are close to what a brand-new home would demand.
| Knock down & rebuild | Renovate | |
|---|---|---|
| Cost certainty | A predictable, fixed-price solution, designed from the ground up | Costs can change as problems are uncovered mid-project |
| Hidden problems | You start from a clear site, so there is nothing to uncover | Structural issues, electrical problems or water damage can appear |
| Layout | A design that suits how you live now | Working around a layout drawn decades ago |
| Modern standards | Built to current standards for energy efficiency and liveability | Older homes may not meet modern standards for layout or efficiency |
| Land value | Immediately improves street appeal and long-term resale potential | Improvement is limited by the existing structure |
This is our case for rebuilding, and it will not be right for every block. We have written a longer, balanced comparison at knock down rebuild vs renovation. Worth reading before you decide.
Don’t risk the wrong builder
Choosing a knockdown builder in Perth matters: difficult sites, older suburbs and demolition stages all need specialised experience. We help you compare the right builders so you avoid costly delays or oversights.
- Get the right builder for your site conditions
- Choose a design that fits your goals and local zoning
- Lock in true turnkey pricing with no fluff
- Get realistic timelines, and help pushing things forward
Knockdown rebuild questions we get most
What does a knockdown rebuild cost in Perth?
There is no useful average, because the block is the variable. Budget the stack rather than the build: demolition and asbestos, about $3,340 in fixed permit and disconnection fees, the building permit fee and levy, site works, the house itself, and twelve to eighteen months of rent and loan interest. Price each line against your own block.
Is a knockdown rebuild worth it?
It is worth it when the location carries the value and the house does not. The honest test: would you pay today’s land value for the block with nothing on it? If yes, a rebuild usually stacks up. If the house is sound and the problem is the layout, read knock down rebuild vs renovation first.
Is $400,000 enough to build a house in Perth?
For a knockdown rebuild it is the wrong question, because a build price is not a project price. It leaves out demolition, asbestos, the fees and disconnections, the building permit, site works priced from your soil test, and your rent and loan interest while you wait. Ask a builder what their price includes and what it assumes about your block, then add the rest around it. We will do that with you at no cost.
Do I pay stamp duty on a knockdown rebuild?
No. You already own the land, so there is no transfer and no transfer duty (stamp duty) on the property. That is one of the real financial advantages over buying an established home somewhere else. Confirm your own position with your settlement agent.
How long does a knockdown rebuild take?
Plan on about eighteen months from first quote to handover. The approvals have statutory clocks of 10 to 25 business days, but the gas, power and water disconnections ahead of them set the real pace. Lodge the gas disconnection first.
Get in touch about your rebuild
Bring us your block. We will look at what it can take, compare the builders who actually do this work, and give you a straight answer, at no cost to you.
